Many surveying projects will be suspended or affected in March and April due to the rainy days, especially for those projects with short project circles since they can only carry on stakeout work for one or two kilometres on rare sunny days. The surveying processes are slow and fail to meet the project schedules.
With the introduction of vRTK, a visual RTK with a live-view function, road reconstruction in bad weather is no longer a problem. The process of the stakeout in old county road reconstruction projects will be driven by this latest surveying technology.
The construction setting out process in road renovation projects will always be interrupted by ditches, woods and other barriers when using traditional RTK or total station, thus the efficiency and data accuracy will be affected greatly, especially in the county roads, villages and other complex environments. Enhancing the precision of position data and meeting the project schedule would be very difficult for traditional positioning methods due to the technology and operational limitations
Accuracy of stakeout within 3cm
The projects normally carry out in the surrounding area of villages, residential areas and high-tech zones, and it is vital to make sure the transportation in the everyday life of the residents and enterprises will not be influenced when the road is being renovated. And, importantly, underground water and electrical pipelines should be well protected and not damaged by the construction process. Since the project timeline is tight, the whole stakeout work should be completed quickly.
Using RTK for stakeout is efficient, but it is difficult to locate the exact sample point in the last 10cm. Also, tilt measurements of wall corners and ditches are very time and energy consuming.
Equipment: vRTK
Using vRTK for stakeout to meet a tight deadline without sacrificing quality. The combination of RTK and imagery measurement helps to mark out the stakeout points in the visual image, and the surveyor can find the points quickly and move on to the next step.
360-degree AR stakeout in the controller or real-time stakeout with the host receiver provides an immersive stakeout experience without keeping your head down to check the stakeout points frequently.
With the new tilt survey experience, we won’t need to operate another initialization step separately or hold the alignment bar, making measurement easier and faster.
The controller camera would be activated when open the AR stakeout page, and we can get near to the stakeout point with the real-time imagery navigation. The controller image will switch to the receiver automatically when we are near the point, so the point in the real-time image of the bottom camera can be marked directly, and we can see the field location of the stakeout point clearly.
After completing a sample point, click ‘Next’, the imagery will guide us to the next nearest sample point.
In the past, the most time-consuming part of the RTK stakeout was the 10cm near the exact position since it was really hard to find the point in such a short distance, and we can only ask the skilled can do the stakeout work.
Now, the vRTK directs us to the stakeout point accurately without spending too much time. The time of “people find points” has ended, now it is the era of “points find people”, we would say the working efficiency is improved by the visual RTK GNSS receiver tremendously